Get the Best Deal of the Year Before the Promo Ends! 🔥
00
H
:
00
:
00

Earned Value Management Excel Template

Track and analyze project performance with a sophisticated Excel template that automatically calculates earned value metrics, cost variances, and project forecasts through visual and numerical analysis.

Already have an account?  Sign in
Earned Value Management Excel Template

About the Earned Value Management Excel Template

This Excel template implements Earned Value Management (EVM) principles to provide real-time project performance tracking. It combines budgeted costs, actual costs, and earned value calculations with automated performance metrics and visual trend analysis, presented in a professional blue color scheme.

The template features comprehensive project tracking capabilities, including Work Breakdown Structure (WBS) integration, cumulative cost tracking, and performance indices calculation.

What is Earned Value Management?

Earned Value Management is a project management technique that compares the planned value of work against actual costs and completed work value. It provides early warnings of performance problems and enables data-driven project forecasting.

The Excel template implements this through:

  • Planned Value (PV) tracking by period, shown in blue bars
  • Earned Value (EV) calculations, displayed in lighter blue
  • Actual Cost (AC) monitoring, with distinct visual representation
  • Automated performance metrics
  • Visual trend analysis with color-coded graphs
  • WBS-based activity tracking with alternating blue row shading

Why It Matters

Project managers often struggle to accurately measure project performance and forecast completion costs. Traditional tracking methods may not provide early warning signs of project issues or reliable completion estimates.

This template addresses these challenges by providing real-time performance metrics and trend analysis, enabling project managers to identify variances early and make data-driven decisions about corrective actions.

Benefits

  • Professional blue-themed visual design for clear data presentation
  • Tracks planned value across 12 time periods
  • Calculates cost and schedule variances automatically
  • Provides performance indices (CPI and SPI)
  • Generates color-coded visual performance trends
  • Supports WBS-based activity planning with alternating row colors
  • Enables period-by-period cost tracking
  • Calculates Estimate at Completion (EAC)

How to Use

  1. Initial Setup
  • Enter project name and company information
  • Input WBS activities and budgeted costs in the blue-shaded table
  • Set up planned value distribution
  • Enter preparation details (preparer, date, period)
  1. Cost Tracking
  • Update actual costs per period in dedicated tracking section
  • Record earned value for completed work
  • Monitor cumulative totals in the blue summary rows
  • Review variance calculations
  1. Performance Analysis
  • Check Cost Performance Index (CPI)
  • Review Schedule Performance Index (SPI)
  • Analyze variance trends with color-coded indicators
  • Monitor estimated completion costs

[Previous sections remain largely the same through Technical Essentials]

Technical Essentials

  • Excel compatibility with standard versions
  • Automated calculations for:
    • Cost Variance (CV) with red/green indicators
    • Schedule Variance (SV)
    • Performance Indices (CPI, SPI)
    • Estimate at Completion (EAC)
  • Built-in features:
    • Blue-themed WBS structure (8 activities shown)
    • 12-period tracking with totals
    • Cumulative calculations in highlighted rows
    • Performance metrics with color coding
    • Bar chart visualization
    • Actual cost tracking
    • Earned value calculation
    • Alternating blue row shading for readability

The Earned Value Management Excel template transforms complex project performance tracking into an intuitive, data-driven process with professional blue-themed visualization. By implementing this template, project managers can immediately benefit from improved performance visibility, better cost control, and more accurate project forecasting. Start using this template today to enhance your project performance management capabilities.

Earned Value Management Excel Template

Track and analyze project performance with a sophisticated Excel template that automatically calculates earned value metrics, cost variances, and project forecasts through visual and numerical analysis.

Get started with Quicksheets

Try Pitch for free
Instant access
Free monthly updates
Unlimited downloads